Deployment & Maintenance

Pre-deployment checklist

  • Confirm enclosure is IP-rated and use proper cable glands.
  • Verify battery has protection PCB and Waveshare charging shows normal status.
  • Install inline fuses on PV and battery lines.
  • Secure tubing, strainers, and filters to prevent clogging.

Installation steps

  1. Mount enclosure and solar panel in a sunny spot with good tilt.
  2. Route cables through glands; seal glands after wiring.
  3. Place soil sensors at representative depths; avoid compaction.
  4. Connect valves and run a manual valve test (10 cycles) and inspect for leaks.
  5. Calibrate sensors in-situ and log baseline values.
  6. Start with conservative watering thresholds and observe for 1–2 weeks.

Maintenance schedule

  • Weekly: inspect filters and sensor readings.
  • Monthly: clean panels, verify battery voltage, inspect seals.
  • Every 6–12 months: replace filters, inspect tube joints and solenoid operation.

Fail-safes & recovery

  • Valve default to closed (NC) on power loss.
  • If telemetry is lost for > X hours, system reverts to safe schedule or disabled watering.
  • Low-battery shutdown: enter low-power mode and disable watering below a configurable voltage.

TODO: Add real-world deployment photos and a commissioning checklist CSV.