Testing & Commissioning

Pre-power checks

  • Double-check polarity on all battery and PV connections.
  • Ensure fuses are fitted and protection PCB installed on cell.
  • Confirm Waveshare board model and max PV voltage.

Basic tests

TestHowAccept/Notes
PV VocMeasure open-circuit in sun~18 V for single 12 V panel │
PV IscMeasure short-circuit current briefly with clampmatches panel spec approx 0.83 A
Charge LED/statusConnect PV + battery → check Waveshare LED/stateModule should show charging status
Output railsMeasure 5 V / 3.3 V under loadWithin tolerance +-5%
Solenoid switchActivate via MOSFET; measure current and tempCurrent should match spec; no excessive heating

Commissioning log

  • Create testing/logs/ and record: date, Voc, Isc, battery voltage, charge current, notes.

Maintenance: inspect seals annually; check battery health monthly.